Before

Before

After

After

Foundations come first

Set up the first stringer

Add a helper stringer

Setting the treads on the helper

Lower carriage assembled

Treads bolted onto stringer

Start the mid-level landing

Mid-level landing

Prepare for upper carriage

Upper carriage is set

Upper Landing in place

Be sure to finish the bottom side

Plug all bolts holes with Cedar Dutchmen

Preparing the railing

Setting the top & lower rails

Installing the balusters

Railing assembly progressing

Lower rail detail

Top rail detail

Railings in place

Upper carriage, landing & railing

Include a custom Mahogny door

Tread lighting with concealed wires

Newel posts trimmed out & lighting installed

Completed Custom Cedar Staircase

Staircase with cedar porches